| Project Type |
Project Specifics |
Completion Date |
|
|
|
| Sidewalk/Path/Trail Construction |
- Constructing new sidewalks on the west side of Elk Run Boulevard from Lady MacDonald Drive to Glacier Drive.
|
Complete
|
|
- Constructing new sidewalk on the west side of 7th Avenue between 10th Street and “the Pond”
|
Complete
|
|
- Constructing a trail switchback along Spray Lake Road near the Trans-Alta Substation
|
Summer 2009
|
|
- Widening the sidewalk on the south side of 10th Street between 7th and 6th Avenues
|
Complete
|
|
- Construction of the Canmore-Banff trail with the Bow Corridor Regional Mobility Partnership
|
Fall 2010
|
|
- Conceptual design and public consultation for 10th Street between Policeman's Creek and 8th Avenue
|
Deferred to 2011
|
|
- Install pedestrian signal on Benchlands Trail at Cougar Creek Drive adjacent to Summit Cafe
|
August 28
|
|
- Pave path Northeast of Benchlands Trail from Elk Run Boulevard to Benchlands Terrace and to Cougar Creek Drive (upper)
|
Summer 2009
|
|
- Pave "Cougar Commuter" path along Cougar Creek from Elk Run Boulevard to the Trans Canada Highway then to Benchlands Overpass
|
Summer 2009
|
| Town Centre Enhancements |
- Burial of overhead utility lines throughout the Town Centre
|
Complete
|
|
- Construct public plaza on 7th Avenue in front of the Civic Centre and an expansion of the pedestrian realm on 6th Avenue in front of the Rotary Friendship Park
|
Oct 2009
|
|
|
|
| Street/Stormwater Reconstruction |
- Reconstructing roadways and stormwater facilities, and replacing underground utilities on Three Sisters Drive and MacDonald Place
|
Aug 2009
|
|
- Designing integrated road and stormwater improvements in South Canmore
|
Fall 2009
|
|
- Designing improvements on Railway Avenue (between Main Street and Gateway Avenue)
|
Fall 2009
|
|
- Designing road improvements along Mountain Avenue
|
2009
|
|
- Rehabilitating various roadways throughout Town with asphalt overlays (or mills and inlays) and microsurfacing, as part of an annual pavement management program. Work will occur on the following streets:
- Cougar Creek Drive
- Industrial Place
- Rummel Place
- Olympic Drive
- Ray McBride Street
|
August 14
|
|
|
|
| Stormwater Management |
- Designing conveyance and infiltration facilities to manage stormwater from the Western Basin
|
2009
|
|
- Designing improvements on Cougar Creek for erosion and sediment control
|
2009
|
|
- Install new stormwater treatment and infiltration facilities at 100 -200 Larch (Larch Lake)
|
Complete
|
|
- Addressing stormwater drainage ponding issues on the pathway at the Policeman’s Creek trail junction with Pinewoods Crescent
|
Complete
|
|
|
Complete
|
| Other Major Studies |
- In partnership with the Town of Banff and Improvement District #9 apply to the Province for the creation of Regional Services Commission for Regional Transit in the Bow Valley
|
Spring 2010
|
|
|
|
| Upcoming Projects |
In addition to continuing the implementation of uncompleted projects, additional work proposed in the 2009 Budget for Council approval include: |
|
|
- Designing infiltration facilities to manage stormwater from the Palliser and Silvertip areas
|
Fall 2009
|
|
- Designing integrated roadway and stormwater improvements on Bow Valley Trail (from 17th Street to Montane Road)
|
Fall 2009
|
|
|
|